The 98th Avenue SE (97th Place SE) and SE 11th Street Slope Stabilization project constructed a new wall to stabilize the existing slope on the southwest corner of the intersection of 98th Avenue SE (97th Place SE) and SE 11th Street.

A map showing the area of construction for the 98th Avenue SE slope stabilization project. It also shows the detour via SE 16th Street, Bellevue Way SE, Main Street, 101st Avenue SE, 98th Avenue SE and 99th Avenue SE.

This project:

  • Constructed a new wall and barrier along the southwest corner of the intersection of 98th Avenue SE (97th Place SE) and SE 11th Street to stabilize an existing slope.
  • Replaced watermain within the project limits.
  • Improved the storm system and install new curb and gutter to capture storm water.
  • Overlaid pavement and replace striping within the project limits.

Funding

Construction funding comes from two federal grants from the Federal Highway Administration and the City of Bellevue’s Major Maintenance Program. Estimated cost is $2.3 million.