Permit for the construction of a stormwater detention structure. (BH)

Apply for this permit online through MyBuildingPermit

Required Documents

The documents listed below are the minimum necessary to proceed with the application process. If you believe that a required submittal document does not apply to your project, please upload the Document Waiver Form in place of the required document. 

Review the building permit requirements for Underground Utility Infrastructure work.