Excavation and shoring of property adjacent to the City of Bellevue right of way. (BV)

Apply for this permit online through MyBuildingPermit

Required Documents

The documents listed below are the minimum necessary to proceed with the application process. If you believe that a required submittal document does not apply to your project, please upload the Document Waiver Form in place of the required document. 

For assistance with electronic plan submittals, refer to Requirements for Electronic Plans

Additional Documents

These items may be required during plan review, as determined by the scope of your project.

  • Preapplication Conference Letter 
  • Structural Calculations

Fees and Timelines

Development Services

Permit Center
Telephone
Hours
In-person Permit Center services are available Monday to Thursday, 10 a.m.-3 p.m.

The Permit Center is open Friday, 10 a.m.-3 p.m., with customers visiting City Hall served remotely.
Business Hours
Monday - Friday 8 a.m. to 4 p.m.