State Environmental Policy Act (SEPA) threshold determination when not associated with a project action or another permit, as determined by the environmental coordinator. (LM)

Apply for this permit online at MyBuildingPermit. When entering your Application Information, choose the following:

  1. Application type: Land Use
  2. Project type: Nonresidential or Multifamily Residential
  3. Activity type: Project or Site Plan Approval
  4. Scope of work: SEPA only

Required Documents

The documents listed below are the minimum necessary to proceed with the application process. If you believe that a required submittal document does not apply to your project, please upload the Document Waiver Form in place of the required document.

Building Design Documents and Site and Infrastructure Design Documents must be submitted as a single PDF. This helps streamline the review process. 

When submitting the multi-plan set PDF, bookmarks are required. The text for each bookmark should correspond to the specific plan types, as listed below. 

Bookmarks must be clearly labeled to match the plan type.

For assistance with electronic plan submittals, refer to Requirements for Electronic Plans

Fees and Timelines

Development Services

Permit Center
Telephone
Hours
In-person Permit Center services are available Monday to Thursday, 10 a.m.-3 p.m.

The Permit Center is open Friday, 10 a.m.-3 p.m., with customers visiting City Hall served remotely.
Business Hours
Monday - Friday 8 a.m. to 4 p.m.